Sidebar

Anmeldung

Register for free and get access to all article downloads.

Remember Me
  • Create an account
  • Forgot your username?
  • Forgot your password?
STEEL GRIPS STEEL GRIPS
  • steel news
    • guidelines for authors
    • advertising
    • contact
    • data protection
    • imprint
    • search
  • login - register
    • reset password
  • Newsletter

steel news

SMS group installs its first AI-based Integrated Operating Center at Daye Special Steel

Empty
  •  Print 
Details
29 November 2022
  • Centralized operator monitoring of the entire 460 millimeter tube plant using AI video analytics
  • Only six operators are required to supervise the entire rolling line

SMS group has completed its first X-Pact® IOC (Integrated Operating Center), a central monitoring room for the entire 460-millimeter tube plant, at Daye Special Steel in Hubei Province, China. With the Daye 460 project, which also includes the enhancement of the tube plant's existing automation systems, SMS group has achieved a breakthrough in its Integrated Operating Center (IOC) application, an important milestone on the path to X-Pact® Lights-out.

Hits: 623
Read more: SMS group installs its first AI-based Integrated...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

Primetals Technologies receives FAC for electric steel plant from Gerdau Special Steel North America

Empty
  •  Print 
Details
29 November 2022
  • Project included modernization of existing electric arc furnace
  • Primetals Technologies supplied a new twin ladle furnace and new material handling system
  • Overall plant capacity to increase substantially
  • Comprehensive plant optimization thanks to a high degree of automation and the use of robotic systems
  • Robotic systems to further improve occupational safety

Primetals Technologies has received the final acceptance certificate (FAC) from Gerdau Special Steel North America for the modernization of its electric steel plant in Monroe, Michigan, U.S.A. The project included modernizing the existing electric arc furnace (EAF). The electric steel plant was also equipped with a new twin ladle furnace, a new material handling system, and related auxiliary equipment.

Hits: 431
Read more: Primetals Technologies receives FAC for electric...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

JSW Steel’s two new slab casters from Primetals Technologies at the Dolvi steel plant.

Empty
  •  Print 
Details
23 November 2022

The new ship lift that recently opened in Niederfinow is built with steel from Dillinger. Located at the eastern end of the Oder-Havel Canal in Niederfinow in Brandenburg, it hoists ships in a suspended steel trough over a 36-meter difference in elevation from the Oder into the Havel Canal and vice versa.

Hits: 365
Read more: JSW Steel’s two new slab casters from Primetals...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

Primetals Technologies and JSW Dolvi sign large maintenance service contract to boost equipment lifetime

Empty
  •  Print 
Details
23 November 2022
  • Primetals Technologies will provide maintenance services to JSW Dolvi’s two new 2-strand slab casters
  • Services will increase equipment lifetime, thereby reducing machine downtime and improving product quality
  • Duration of initial term is three years

JSW Dolvi has placed an order with Primetals Technologies for comprehensive maintenance services, including spare parts supply, for its new continuous casters at the steel plant in Dolvi, Maharashtra province, India. The slab casters have a production capacity between 4 and 4.5 million tons of steel per year.

Hits: 326
Read more: Primetals Technologies and JSW Dolvi sign large...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

Sustainable aluminum production in northern Spain

Empty
  •  Print 
Details
22 November 2022

LatemAluminium commissions SMS group to supply an aluminum cold rolling mill for its new plant in the Spanish province of Castilla y León

  • High-end aluminum cold rolling mill including highly efficient cleaning and filter technology for environmentally friendly cold strip production
  • The first aluminium coil is scheduled to be produced in April 2024
Hits: 345
Read more: Sustainable aluminum production in northern Spain
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

H2 Green Steel's landmark project in Sweden showcases SMS technology

Empty
  •  Print 
Details
14 November 2022

SMS group supplies process technology for the world's first large-scale green steel production plant

  • Green steel production based on green hydrogen instead of carbon
  • SMS group supply from melt shop to finishing lines
  • Focus on CO2-neutrality, whole process chain almost carbon neutral
  • Order size of more than EUR 1 billion, including announced orders awarded to Midrex and Paul Wurth
  • Lighthouse project proves SMS´s green steel mission
Hits: 630
Read more: H2 Green Steel's landmark project in Sweden...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

voestalpine Stahl Donawitz to expand integrated quality control system from Primetals Technologies across the entire production chain

Empty
  •  Print 
Details
12 November 2022
  • New order for the integrated quality control system Through-Process Quality Control (TPQC)
  • Ensures automatic long-term data evaluation resulting in improved product quality
  • Automatic quality evaluation along the entire production chain in the steel mill

Primetals Technologies recently received a new order from voestalpine for implementing the knowledge-based quality control system Through-Process Quality Control (TPQC) at the steel plant in Donawitz, Austria. Implementation is scheduled for the 2nd quarter of 2023.

Hits: 265
Read more: voestalpine Stahl Donawitz to expand integrated...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

Advanced titanium materials for the aerospace industry

Empty
  •  Print 
Details
09 November 2022

American titanium specialist Perryman orders two new plants from SMS with fully integrated process and production control system.

  • Forging line with fully integrated process and production control from a single source
  • High-performance titanium materials for parts in the aerospace industry as well as for medical applications
  • Digitalization solutions and technology packages enhance productivity and efficiency levels
Hits: 313
Read more: Advanced titanium materials for the aerospace...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

thyssenkrupp Electrical Steel Successfully Puts PSImetals 5 into Operation

Empty
  •  Print 
Details
08 November 2022

thyssenkrupp Electrical Steel GmbH has successfully launched the production management system PSImetals 5 from PSI Metals. The software modules Production and Quality control the cold rolling mill, heat treatment, surface treatment and cutting. The solution allows for a seamless integration of the production processes with the business layer in ERP and plant automation.

Hits: 396
Read more: thyssenkrupp Electrical Steel Successfully Puts...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

Primetals Technologies and RHI Magnesita develop new melting technology for low grade DRI

Empty
  •  Print 
Details
08 November 2022
  • Designed to replace the blast furnace
  • Reduces CO2 emissions to a minimum
  • Technology ready for implementation

Most of the CO2 emissions in steelmaking comes from the blast furnace process, which today is still the main production route. Primetals Technologies is developing a new green steel technology to replace blast furnace plants and has signed a collaboration contract with RHI Magnesita, the global leader in refractory innovations.

Hits: 235
Read more: Primetals Technologies and RHI Magnesita develop...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

Nucor to Construct Two Flat-Rolled Galvanizing Lines

Empty
  •  Print 
Details
25 October 2022

Nucor Corporation's Board of Directors approved the construction of a galvanizing line at Nucor Steel Berkeley in South Carolina to support the company's strategy to expand its capabilities and grow participation in the automotive and consumer durables markets. The $425 million investment will create more than 50 new full-time jobs and start-up is expected in mid-2025. Additionally, Nucor's Board of Directors approved a galvanizing line to be constructed in the western United States with details to be announced at a future date.

Hits: 522
Read more: Nucor to Construct Two Flat-Rolled Galvanizing...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive

Siderúrgica Huachipato commissions SMS with digitalization project for significant improvement of energy efficiency in its steel mill

Empty
  •  Print 
Details
25 October 2022
  • Optimizing the plant's energy management through digitalization
  • Reducing CO2 emissions by up to 14 kilotons per year
  • Performance partnership within a 36-month subscription model

SMS digital, a Center of Excellence of the SMS group, has signed an agreement to implement a package of advanced digital services for the Siderúrgica Huachipato steel mill at the Talcahuano site.

Hits: 344
Read more: Siderúrgica Huachipato commissions SMS with...
Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
Page 5 of 58
  • Start
  • Prev
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • Next
  • End

Subscribe here to our monthly Newsletter!

SMS_2023_banner

tags

  • additive manufacturing
  • automotive
  • green steel
  • manganese steel
  • welding
  • cooling process
  • factorial design
  • nitrogen
  • stainless
  • wear

best read

  • Third MEROS off-gas cleaning plant started up at Acciaierie d’Italia’s steel plant in Italy
  • ElvalHalcor operates the largest Airwash™ system from SMS group for exhaust air purification in the aluminum cold rolling process
  • SSAB highlights the pre-requisites for green transition at EU Summit in Kiruna
  • Changes in SSAB’s Group Executive Committee
  • Primetals Technologies to supply Southwire Company with new SCR copper rod mill for Jinchuan Group
  • Order for 2.5-Mtpy hydrogen-ready DRI plant

© Copyright 2020 IMP InterMediaPro e.K., All rights reserved. Reproduction in whole or in part without permission is prohibited.

ISSN: 1611-4442, DOI # 10.5161


Bootstrap is a front-end framework of Twitter, Inc. Code licensed under MIT License. Font Awesome font licensed under SIL OFL 1.1.