Centro Combustion to upgrade the furnace of galv line #1 in Ravenna.
The aim of the project is to increase the furnace throughput up to 160 t/h of hot-rolled coil, to upgrade the combustion system and the after-pot cooling tower equipment, complying with the latest safety requirements.