International technology group ANDRITZ has received an order from Swiss Steel AG, Switzerland, for the supply, installation, and startup of a new walking beam furnace with an output of 150 t/h for heating the continuous-cast billets at the Emmenbrücke plant, Switzerland. Start-up is scheduled for the fourth quarter of 2019.
Start-up Mapudo is the new “online wire” connection to Saarstahl
· Source 2A material easily using the platform mapudo.com
· Joint presentation in hall 12 at stand A 72
Since the laser micro machining specialist GFH has grown continuously at an average rate of 50% over the last few years, a decision was made in the spring of 2016 to increase production capacities and expand at the Deggendorf location.
PJSC ArcelorMittal Kryvyi Rih, Ukraine, has awarded SMS group (www.sms-group.com) the contract to supply two secondary metallurgy plants and two six-strand continuous billet casters (Nos. 2 and 3).